DTM™

Technical Documentation
ROADMAP

Post-Quantum Engineering (PQE) Roadmap

January 8, 2024
Security Architecture Team
Type: ROADMAP

Attribution: DTM (Dynamic Threat Mitigation) designed by Dr. Todd M. Price. CART (Continuous Automated Red-Teaming) and PQE (Post-Quantum Engineering) built into the SaaS platform by Price-Oquindo.

Objectives
  • Inventory crypto usage and risks; enable policy-driven crypto selection.
  • Adopt hybrid PQC for key exchange/signatures where supported.
  • Maintain interoperability and performance within SLOs; capture evidence.
0–90 Days
  • Discovery pipeline (SBOMs, CA logs, traffic sampling).
  • Policy definitions: approved algorithms, key lifetimes, hybrid modes.
  • Pilot hybrid in gateways/mesh for top flows; performance baselines.
91–180 Days
  • Expand hybrid enablement; vendor readiness checks; fallbacks verified.
  • CART-informed prioritization; exception management with sunsets.
  • Partner compatibility testing; publish matrices + SLOs.
181–365 Days
  • Scale rollout via CI/CD; enforce deprecations for classical-only paths.
  • Supplier PQC readiness in contracts; external attestations.
  • Ongoing monitoring; periodic policy refresh.
KPIs
  • % traffic under hybrid/PQC control
  • Interop pass rate
  • Latency delta
  • CPU overhead
  • Exception age

TECHNICAL DOCUMENTATION | Aegis Project — PQE Roadmap